Lake Oswego 2013 - 2017 Moratorium Map

The roadways highlighted on the Street Project Map fall within the 5-year street cut moratorium.  If a street cut is unavoidable then a more substantial patch repair must be made.  Contact the Engineering Department for more details when planning street cut work on moratorium streets.