The Summer 2014 construction season in Lake Oswego will be very busy!  City of Lake Oswego contractors will be putting in new infrastructure from May through October.  The map shows the locations of those projects, and the table below provides a brief description, timeline, and contact information for each project.  The Lake Oswego – Tigard Water Partnership is shown by the blue line for informational purposes, and will be constructed over the next 18-24 months.  Project specific signage and information bulletins will be provided on a project-by-project basis as the construction activities get underway.

View Map

Summer 2014 Construction Projects

PROJECT NAME

LOCATION(s)

TYPE OF WORK 

CONTACT

 DATES     

Rockinghorse Ln

E End of Rockinghorse Ln

Hillside Stabilization

Rob Amsberry
503-635-0268

July – Oct

Ash St Deep Culvert

Ash St, E of Erickson

Replace failing culvert

David Kudna
503-534-5299

June – Oct

Kerr Parkway Pavement Rehab

All of Kerr Parkway within City Limits

Surface water, street repairs and full overlay

Crystal M. Shum
503-697-7420

Feb-Sept

Palisades Terrace Dr & Westridge Dr Repaving

All of Palisades Terrace & Westridge, & east end of Terrace Dr

Paving, Surface Water and ADA ramps

Crystal M. Shum
503-697-7420

April-Sept

Westlake Dr Repaving

All of Westlake Dr

Structural Repairs and full Overlay

Crystal M. Shum
503-697-7420

July-Sept

Pavement Preservation

City-Wide

Patching & Crack Sealing

Crystal M. Shum
503-697-7420

June-Oct

Cervantes Water Line

Most of Cervantes

Replace 1800 LF of Water Line

Josh Robertson 503-635-0267

April-Sept

Lake Bay Ct Wastewater

N of Lake Bay Ct & W of 6th St

Replace Wastewater Lines

Josh Robertson 503-635-0267

July–Nov

Wastewater Pump Station Upgrades

Lily Bay Ct, Bay View Ln & Maple St

Replace 3 aging Wastewater Pump Stations

Josh Robertson 503-635-0267

April-Oct

LO-Tigard Water Transmission Line

West Linn to Waluga Reservoir

Major Waterline Construction

Construction Hotline
503-697-6502

2014-16